Skip to main content
Loading…
This section is included in your selections.

(a) Prior to application, the petitioner shall set up a pre-application conference with Planning and Development staff. This conference is intended to inform the petitioner of the purpose and objectives of these regulations. In so doing, the petitioner and the planning staff may reach mutual conclusions regarding the possible effect of the project on abutting properties and the petitioner will gain a better understanding of subsequent required procedures.

(b) Applications for conditional use permits shall be made in triplicate to the Department of Planning and Development on forms furnished by the Department of Planning and Development and shall include the following:

1. Name, address and phone number of the applicant, owner of the site, architect, professional engineer, contractor, and authorized agent.

2. Description of the subject site by lot, block, and recorded subdivision or by metes and bounds; address of the subject site; type of structure; proposed operation or use of the structure or site; number of employees, and the zoning district within which the subject site is located.

3. Plat of survey and/or a site plan layout consisting of a survey prepared by a land surveyor registered by the State of Wisconsin or other map drawn to scale and approved by the Department of Planning and Development showing all of the information required under section 12.05.010(h)3 for a zoning permit. In addition, the plat of survey or site plan layout or map shall show the location, elevation and use of any abutting lands and the location and foundation elevations of structures within 50 feet of the subject site; soil mapping unit lines; ordinary high water mark, historic high water marks and floodlands on or within 50 feet of the subject premises, and existing and proposed landscaping. Such plans as, for example, a plan of operation, may be required as well as impact statements. (11/5/86)

4. For shoreland and floodland conditional uses, such description shall also include information that is necessary for the County Planning, Development & Extension Education Committee to determine whether the proposed development will hamper flood flows, impair floodplain storage capacity, or cause danger to human, animal or aquatic life. This additional information may include plans, certified by a registered professional engineer or land surveyor, showing existing and proposed elevations or con-tours of the ground; fill or storage elevation; basement and first floor elevations of structures; size, location, and spatial arrangement of all existing and proposed structures on the site; location and elevation of streets water supply and sanitary facilities; aerial photographs, and photographs showing existing surrounding land uses and vegetation upstream and downstream; soil types and any other pertinent information required by either the Planning, Development & Extension Education Committee or the Department of Planning and Development. (11/5/84)

5. Additional information relative to the elimination or alleviation or control of the danger, hazard or nuisance sought to be averted as may be required by the Planning, Development & Extension Education Committee or the Department of Planning and Development, such as, without limitation due to enumeration, ground surface elevations, basement and first floor elevations, utility elevations, detailed landscape plans, plans of operation, hours, parking plans and waste disposal plans as defined in this ordinance, historic and probable future flood water elevations, areas subject to inundation by flood waters, depths of inundation, floodproofing measures, soil type, slope, and boundaries, and plans for proposed structures giving dimensions and elevations pertinent to the determination of the hydraulic capacity of the structure or its effects on flood flows. (11/5/84)

6. A list of property owners and parties of interest and their addresses certified by the Kenosha County Assessor’s Office as required by section 12.05 of this ordinance.

7. An agreement to abide by the terms of this ordinance and any permit issued pursuant to it.

8. The fee as required by section 12.05.080 of this Ordinance. [Code § 12.29-4.]