(1) Plowing Inspection. Mound systems shall be inspected at the time the ground surface is to be plowed, however the Sanitarian may waive this inspection if dry soil conditions have been observed throughout the County. It is preferred to have at least a portion of the sand fill on the construction site in order to evaluate the sand for compliance with ASTM-C33.

(2) Primary Inspection. A second inspection shall be required at the time the treatment tanks are installed and complete and the dispersal cell is complete on the sand fill including the distribution piping.

(3) Follow-up Inspection. A final inspection may be performed after backfilling has been completed and final grading, seeding and mulching has been completed on the mound. All components shall be completed at this time. [Code § 15.05-5.]