Skip to main content
Loading…
This section is included in your selections.

(a) As-Built Stormwater Facilities Survey. To ensure compliance with this ordinance and to serve as a basis for the engineering verification under Section 17.08-4(b), an as-built survey shall be completed by a registered land surveyor licensed in the State of Wisconsin and certified as in conformance with the approved construction plans by the Project Engineer. As-built plans shall only be completed once the site is stabilized. As-built plans in accordance with Section 17.09-8 shall be submitted to P&D for all stormwater management BMPs, conveyance systems including storm sewers, bridges, culverts, and other components as deemed necessary by P&D to ensure the long-term maintenance of all site stormwater components. P&D shall require a digital submittal of the as-built survey, in accordance with P&D mapping standards. A complete Stormwater Management Facility Compliance Report form shall accompany all as-built submissions. Zoning permits may, at the discretion of P&D, not be issued until as-built plans are approved unless financial assurance in accordance with Section 17.08-3 has been provided to the County.

(b) Verification. The Project Engineer shall verify, in accordance with P&D standards, that all site inspections outlined in the approved plans have been completed and that the construction of all stormwater management BMPs, as determined by P&D, comply with the approved plans and applicable technical standards or otherwise satisfy all the requirements of this ordinance. If warm season or wetland plantings are involved, a registered landscape architect or other qualified professional shall verify the planting process and its successful establishment.

(c) Design Summaries. Any changes noted in the as-built survey or final design data compared to the design summaries approved with the final stormwater management plans shall be documented and resubmitted to P&D as part of the verification under Section 17.08-4(b). [Code § 17.08-4.]