Skip to main content
Loading…
This section is included in your selections.

Preliminary erosion control plans shall contain the following items:

(a) A site map in accordance with Section 17.09-5;

(b) A brief narrative describing the proposed land disturbing activity, construction timeline and sequencing, and a general review of the major erosion and sediment control BMPs proposed to be used to minimize off-site impacts during the construction phase and to stabilize the site following construction.

(c) Delineation of the following items on the map under Section 17.15-4(a):

1. The area and size (in acres) of the proposed land disturbance;

2. The woodland and wetland areas, and the size (in acres) of each that is proposed to be lost during construction and a general description of the current vegetation types and tree sizes;

3. The general location of major BMPs described in Section 17.15-4(c)1.

Note: An Erosion Control Plan Requirements Checklist shall accompany all preliminary erosion control plan submittals. The checklist can be obtained on the Kenosha County website or by contacting P&D. [Code § 17.15-4.]