12.26.270 Modifications.
This section is included in your selections.
(a) An owner shall comply with PSC 128.35 before making any material change to a wind energy system.
(b) The Department will conduct a review of any application for a material change in a wind energy system as provided for in PSC 128.35(2). [Code § 12.18.3-27.]