Skip to main content
Loading…
This section is included in your selections.

(1) Initial Inspection. Mechanical Aerobic Treatment Units (ATU’s) shall be inspected at the time of completion of installation and prior to any backfilling and before operation of the unit.

(2) Trained ATU Installer shall be Present. The County shall require a competent manufacturer trained person to be present on the site during the installation of the ATU.

(3) Operational Testing. The County may require a test run inspection at the time of the initial operation of the ATU. [Code § 15.05-8.]